The crew has been working hard to get the foundation ready for next week's pouring. The pillars have been poured already so those 10-17' holes from last week are all filled.
The plywood that is there is along the outer wall of the house and the floor will be about 4" above it.
There were some serious mud that gushed up as the pillar were drilled:
No comments:
Post a Comment