Electrician started to install the light fixtures, plumber the bathroom fixtures and the hardwood flooring started to go in. Tiles continue to make progress and given my growing interest in having a workshop in the garage it was awesome to see the garage concrete flooring poured! Smaller details such as the door knobs are also starting to get installed.

Garage:

IMG_9576

One of the lights:

IMG_9592

Flooring:

IMG_9658

Shower tiles:

IMG_9589