It's starting to feel like it's coming down to the final stretch as it's been installing, installing and installing rather then building.
With the bathroom cabinets in the focus shifts to the kitchen. The flooring is about 40% installed and now some work is starting on the exterior with tearing out the old drive way to make way for the new.
Kitchen base cabinets:
Hardwood flooring:
One of the bathroom countertop installed:
Lots of rebar in the old drive way:
So are you guys going to repaint the green bathroom? the color is not bad, especially for two boys. :)
ReplyDelete